Where Jomtien is
Condos in Jomtien are bought by those who want a long beach and completed buildings of different years. Jomtien beach condos and second-line condominiums are sold alongside new developments, and there are condos in every price group. Jomtien beach stretches about 6 km and lies 3 km from Pattaya Beach, and it is calmer than the central beach. By address, Jomtien is part of the city of Pattaya. The neighbouring Na Jomtien to the south already belongs to the Sattahip district and has its own municipality.
The area runs along the shore. In the north, at Dongtan bay, it is closest to Pratumnak hill. Jomtien Beach Road runs along the beach, and behind it are the second line, Jomtien Sai Song, and the sois leading to Thepprasit Road. Second-line buildings were mostly completed between 2013 and 2022. Thappraya Road connects Jomtien with Pattaya, and the Thappraya area lies nearby.
The Pattaya immigration office is in Jomtien, on Soi 5 of Jomtien Beach Road, and stay extensions are filed there.
Market prices
Prices in Jomtien depend on the age of the building and the distance to the beach. Here is where they stand in October 2026. The borders with neighbouring areas are approximate.
- Completed buildings: about $1,970 per sq m, and for most buildings between $1,610 and $2,830.
- New developments: about $3,670 per sq m.
- One-bedroom in a completed building: about $86,400 for 36.6 sq m.
- Studio: about $74,500 for 26.9 sq m.
Among completed buildings up to $74,500, a studio under the foreign quota starts from $35,800, with typical studios at about $44,700. One-bedrooms under the foreign quota start from $43,500, with typical ones at about $64,100. More than half of the cheap units in the area are under the Thai quota.
Jomtien took a large share of Pattaya’s new condo launches in 2023. Since then unsold stock has built up here and on the southern coast, and developers offer discounts with instalment plans. For a buyer this is a reason to ask the developer about a discount and an instalment plan. The manager will send the exact price, the available condos and the project presentation.
Rents
For those looking at rentals in Jomtien, here is a benchmark. In October 2026 a one-bedroom in a completed building rents for about $440 per month, and a studio for about $340.
The spread between buildings is large. Studios in Lumpini, Laguna and Dusit Grand Park are rented from $200 to 9,500 per month. In older towers by the sea the rates are higher: View Talay 1 from $250 View Talay 5 from $360 View Talay 8 from $450 Jomtien Beach Condo from $420. In The Riviera Jomtien rent starts from $420 and in Jomtien Plaza from $630.
If you divide the price of a one-bedroom by a year of rent, you get about 16 years of rent. After the common-area fee, the land tax and an empty month, the period grows to about 20 years. This is arithmetic, not a forecast. We can help with renting out, and we will do a preliminary calculation for a project separately.
What to check when buying
Quota. A foreigner buys under the foreign quota, with foreigners holding no more than 49% of the building’s floor area. The cheapest listings in Laguna 1, Laguna 2 and Park Lane are marked Thai Quota. Find out the remaining foreign quota before reserving.
Common-area fee. In completed buildings in Jomtien it is from $0 to 50 per sq m per month, and in buildings from 2013 to 2022 more often from 35 to 40. For Aquarous, which is under construction, it is about $0. The juristic entity’s budget gives the rate for a specific building.
Building fund. In completed buildings it is from $10 to 600 per sq m, paid once at the first handover from the developer. On a resale the contribution has usually already been paid by the first owner.
Fee debts. Without a certificate from the juristic entity that there is no debt, the Land Department will not register the transfer.
Renting out. Renting for less than a month without a hotel licence is illegal, and the law does not name an exact limit in days.
Beach and water. The Marine Department finished the first stage of sand filling on 28 November 2023: a 3,575 m stretch with an average width of 50 m. The second stage is due by 13 July 2027. In February 2026, during improvement works, dark wastewater entered the sea off Jomtien, the city hall filed a complaint against the contractor, and later tests showed normal salinity and clarity. In August 2026 oil slicks washed ashore. Look at the latest reports before a viewing.
Transport. Since 10 April 2026 a songthaew costs $0 for a ride of up to 10 km. In 2025 there was no direct route from Jomtien to the centre, and passengers changed in South Pattaya. For living without a car, choose a building closer to the stops and check the route.
Besides Jomtien, people look at Central Pattaya, where malls and hospitals are close.
No commission for the buyer, we check the documents before the deal. We show properties in person and by video.